Hi Experts,
I have a requirement to build a reconciliation report between BW and BPC. I have built a EPM report with BPC and BW connections. I have a requirement to override BW Dimension.
Based of EPM guide, it mentions to override the BW dimension using Dimension with hierarchy, I tried following EPM Dimension Hierarchy formula but its not working. Any suggestions ?
=EPMDimensionOverride("000","0PROFIT_CTR.JWCOAHP0001",D4).
BW 7.4 on HANA SP13
BPC 10.1 SP8
Regards
Bhawick